100% Renewable Power for a Decommissioning Asset
Status: Completed
Scope: ICCP support for late-life offshore platforms
Location: North Sea
Amphibious Energy successfully delivered a fully autonomous, 100% renewable power solution for the Jacky NUI platform in the Central North Sea (part of the Beatrix Field), operated by Ithaca Energy and managed by Wood. The platform was in its late-life phase and scheduled for full decommissioning, requiring reliable power for essential safety and monitoring systems without reliance on gas or diesel generation.
Following a competitive tender involving multiple suppliers, Amphibious Energy was selected to replace a failed renewable system with a custom EnergyPod solution capable of supporting continuous and peak loads. The system powered obstruction lighting, monitoring equipment and other critical low-load consumers, while meeting offshore safety requirements including smoke detection, shutdown functionality and remote monitoring.
The EnergyPod was designed, built and FAT-approved within eight weeks and engineered for helicopter and crane installation. Installed and commissioned offshore in 2019, the system operated continuously on renewable energy only, without the need for backup generators. The project was completed successfully ahead of final removal of the platform in 2021.